SiliconX Construction

Commercial and Industrial Construction Services

  • Home
  • Services
  • About Us
    • Tom Purtell
    • Tony Gonzalez
    • Greg Gonzalez
    • Perla Ramirez
    • Richard Amato
  • Projects
  • Blog
  • Contact
  • Jobs
You are here: Home / Archives for Blog

Phase II Progress Report at Club Auto Sport

June 6, 2012 By Silicon X Construction

So much to do in so little time. We’ve come a long way, baby! – Quaint sayings but in this case, right on the Money!

Phase 2’s foundation was planned, permitted and laid out in 2007 in conjunction with what we all know of as Club Auto Sport. Few knew what lay underneath the trailers and over flow parking on the south side of the property. That is until September 2011 when a deal was struck with Goodies Speed Shop. That deal started a beehive of activity. Club Auto Sport and it’s development team had to deliver a 34,000sf building in just 4 short months!

The ground breaking ceremony occurred on December 14, 2011 and everything started to shake rattle and roll! It has been fascinating watching this unfold. With just a couple of rain delays, we turned over keys to Goodies Speed Shop on May 1, 2012.

Already signed for another space is Supreme Detail Works. And being the ONLY Class A auto-related project in the area, interest is high for the balance of space ranging in size from 1,688sf or contiguous 8,500sf. Contact Anna McQuillan Rose for details at 408.770.1205 or anna@clubautosport.net.

Filed Under: Blog

SiliconX Partners with San Francisco Air Charter Service

June 1, 2012 By Silicon X Construction

How to travel around the state, conduct business in several cities, and still be home in time for dinner?

Borelli Investment Company, parent of SiliconX Construction, recently solved that problem by partnering with Silicon Valley Air Charter – a small plane air taxi service in San Jose. Imagine taking a limo to your sales visits – an “air limo” – departing from the bay area and having you in the far reaches of the state in minutes.

For more information about Bay Area airplane charter – call Silicon Valley Air Charter at 408-599-3205.

Filed Under: Blog

SiliconX Construction Builds Club Auto Sport – Phase II on the Fast Track

May 16, 2012 By Silicon X Construction

Highlights

•   Completed the project on schedule and on budget even while working through the Santa Clara Valley winter

•    Formed and poured 43 concrete panels in stacks in the highly confined parking area behind the existing Club Auto Sport facility

•    Relied on an oversized crane and innovative lifting techniques to safely and efficiently hoist the panels into their vertical positions in the building

cas100x100

Club Auto Sport is a high-end club for auto and motor sports enthusiasts, as well as a unique business community and event center that attracts thousands of upscale guests annually. After a slow start caused by the Great Recession of 2008, Club Auto Sport shifted into high gear. Today, the approximately 87,000 square foot facility is home to a growing roster of more than 40 businesses operating within the unique club. With the main building approaching 90% occupancy, Club Auto Sport-Silicon Valley gave the green light to begin building Club Auto Sport-Phase II. SiliconX Construction was selected as the general contractor.

 

Challenge

While the winter of 2011–2012 will be remembered as one of San Jose’s mildest and driest, it was still winter. Days were short. And when the rain fell, as it did from time to time — it negatively impacted schedules and created difficult working conditions for the construction personnel. This presented challenges in keeping the project on track for a spring completion.

In addition, the club’s second phase was built in a highly confined area behind the initial building — an area that had provided overflow club parking. This necessitated some creative solutions for casting the tilt-up panels used in the phase II structure.

Solution

SiliconX Construction broke ground on the 33,000 square foot Club Auto Sport-Phase II in mid-December. Club Auto Sport had the foresight to prepare a building pad for the second building when the first building was built in 2007–2008. Because of this, the construction on Club Auto Sport-Phase II got off to a fast start, even in the dead of winter.

To allow for the casting of the 43 panels required for the concrete tilt-up structure, SiliconX placed casting slabs in the club’s parking lot. The general contractor also formed and poured a number of the panels in a stack. This was the only way all of the concrete panels could be cast in such a small area.

Finally, to safely and efficiently lift the panels into their final vertical position with so little clearance on the site, SiliconX had to arrange for a crane with an extended height to be brought in — and relied on innovative sliding and rotating lifting techniques to get the job done properly.  Other than some minor redesigning of ADA parking adjacent to the new facility, the rest of the design and construction was relatively straight-forward.

 

Results

SiliconX completed construction of Club Auto Sport-Phase II by the end of April, 2012 — only 4 1/2 months after groundbreaking. Staying on schedule and on budget through the winter months, even with a minimum of weather issues, was a credit to the entire SiliconX team — from the project superintendent to the individual craftsmen and laborers.

“Club Auto Sport was very pleased with the teamwork that SiliconX Construction brought to our Phase II building — in bringing the project in on time and on budget,” said Ralph N. Borelli, co-founder and co-managing partner of Club Auto Sport-Silicon Valley.

The Phase II facility includes 16 individual condos, with five contiguous units leased prior to the start of construction to anchor tenant, Goodies Speed Shop. Goodies is a well-known, highly respected name in the Santa Clara Valley, having provided speed and performance parts and services to hobbyist-owners of American “muscle” cars and other high-performance vehicles, including hot rodders and drag racers, since 1962. Goodies moved its entire retail operation, signature service center, and a fabrication area for many of the custom parts it sells into the new space at Club Auto Sport shortly after the Phase II building opened.

Tony Gonzalez, Director of Construction Operations for SiliconX, oversaw the construction at Club Auto Sport-Phase II.

Filed Under: Blog

Club Auto Sport Phase II Underway

March 15, 2012 By Silicon X Construction

SiliconX is proud to report that the Club Auto Sport Phase II Expansion project is moving along ahead of schedule.

Here’s a picture of the walls being raised.  Many current and prospective tenants and buyers were present to watch the action.

 

Filed Under: Blog

Putting a New Face on a Los Gatos Building

March 8, 2012 By Silicon X Construction

Project Highlights

•   Updated the exterior of a vacant 20,000 sq. ft. commercial building in a prime business location on Los Gatos Blvd. in Los Gatos

•    Completed all exterior improvements on schedule and on budget

•    Provided construction management services for 10,000 sq. ft. of ground floor tenant improvements for YogaSource Los Gatos

•    Are designing and building five of up to ten spaces for the 9,800 sq. ft. of space on the building’s second floor

In 2008, a 20,150 sq. ft., two-story commercial building was constructed on a parcel of just less than one acre on Los Gatos Blvd. in a prime business area in Los Gatos. The expectation was that the building would quickly be leased. But that was before the Great Recession changed everything for a lot of people and businesses throughout Silicon Valley.

 

Challenge

Since its completion in 2008, the building at 16185 Los Gatos Blvd. had sat vacant. In 2009, the Town of Los Gatos issued a use permit for a bakery and café, but the business never moved in. Finally, in mid-2011, new owners purchased the building and signed a lease with YogaSource Los Gatos to occupy the entire 10,350 sq. ft. ground floor.

To ready the building for the new tenants and prepare the 9,800 sq. ft. of space on the second floor for leasing, the new owners called upon SiliconX Construction to give the building a thorough facelift.

 

Solution

Working with Kelly Simcox of Studio G Architects in Campbell, SiliconX updated the exterior design for the building. The fresh new look involved the addition of a stonewall feature to the front of the building facing busy Los Gatos Blvd., as well as repainting the entire exterior. SiliconX also installed a sophisticated new electronic irrigation system and landscaping to improve the overall presentation of the building. In addition, the system includes advanced water metering capabilities that will enable the landlord to accurately track and bill water usage by the building’s tenants.

Further, SiliconX provided construction management services to the building owners for the ground floor tenant improvements for YogaSource Los Gatos — ensuring that all work was completed in a timely manner and within budget.

 

Results

With YogaSource Los Gatos open for business hosting classes, workshops, teacher training, private retreats, and more, the building is finally seeing the use for which it was built.

The building owners have been very satisfied with the work that SiliconX Construction has completed on the building to-date, and the owners have engaged SiliconX to design and build the first five of up to ten units that will be available for lease on the building’s top floor.

Filed Under: Blog

  • « Previous Page
  • 1
  • …
  • 21
  • 22
  • 23
  • 24
  • 25
  • Next Page »

Contact Us

Tel: 408.520.2450
send us e-mail

Download Brochure

Download our brochure here (2mb .pdf)

Recent Blog Posts

  • 425 East Santa Clara St. Office Renovation Capitalizes on Downtown San Jose Revitalization
  • LifeStance and Pacific Coast Psychiatric Associates Open New Office at Solar Row
  • Ready to Help You Move Forward
  • Best Fit for the Job
  • From Blueprint to Business
  • Solar Row at Winchester Office Complex – a Shining Transformation of an Older Building
  • Creating a Welcoming Public Plaza on Busy University Avenue in Palo Alto
  • An Historic Facelift for 526 Waverley in Palo Alto
  • Borelli Transforming Mid-1970s Office Center into Innovative Solar Row at Winchester Complex
  • Office Transformation for Cape Analytics in Mountain View

Links

  • Borelli Investment Company
  • Club Auto Sport
  • Garage Unlimited Monterey
  • Saich Way Station
  • Solar Row

Brochure

Download our brochure here (2mb .pdf)

Links

  • Borelli Investment Company
  • Club Auto Sport
  • Garage Unlimited Monterey
  • Saich Way Station
  • Solar Row

Contact

Tel: 408.520.2450
send us e-mail

Follow Us

  • Facebook
  • Instagram

Copyright © 2021 SiliconX Construction - all rights reserved -Privacy Policy